Experience in the in-depth design, product supply, on-site construction and service guarantee of temporary construction facilities for large-scale events such as the Olympic Games, Asian Games, Universiade, and Youth Olympic Games.
01
Six Advantages
More than 300,000 seats of temporary stands, more than 100,000 square meters of various tents, 12,000 square meters of various media and broadcast platforms, 130 kilometers of security fences, more than 78 large-span street bridges, more than 83 LED large-screen support racks implementation cases.
02
Modular product, flexible structure, convenient adjustment
04
The international introduction of mature product technology, 50 years of zero accident record, after a large number of on-site bearing capacity tests in international events, race time safety monitoring to ensure safety.
03
Strong resource integration capabilities, can provide more than 100,000 square meters of various tents, more than 100 generator sets, and can build a temporary stand of more than 100,000 seats at a time.
06
Professional design team, three-dimensional modeling, SAP2000 structural force analysis; Professional construction team can ensure the simultaneous construction of multiple venues. A team of senior experts to provide the whole process of the event.
05
Service Features
Ensure the quality of the project by monitoring the construction progress.
Monitor construction progress
Use high-quality materials to guarantee the quality of the project.
High quality material application
Adopt perfect safety and environmental protection measures to ensure that the construction process will not cause pollution to the environment, and also ensure the safety of construction personnel.
Perfect safety and environmental protection measures
Quality Assurance Measures